Vugar Bayramov: The Zangezur Corridor May Be Put into Operation by the End of 2028

Vugar Bayramov: The Zangezur Corridor May Be Put into Operation by the End of 2028
Politics 0

The Zangezur corridor may be put into operation by the end of 2028.

As BAKU.WS reports with reference to Report, this was stated to journalists by Milli Majlis deputy Vugar Bayramov on the sidelines of the Future Professions Summit in Nakhchivan.

According to him, the TRIPP project has already been discussed in the Armenian parliament, and work on its implementation has begun.

"In Azerbaijan, work on the section of the Zangezur corridor passing through the country's territory is nearing completion. The highway is already ready, and work on the railway is planned to be completed in early 2027."

Bayramov noted that the current state of the work being carried out gives grounds to speak about the possibility of putting the corridor into operation closer to the end of 2028:

According to him, the Zangezur corridor will become not only a transport route connecting the main part of Azerbaijan with the Nakhchivan Autonomous Republic, but also a strategic project contributing to the economic development of the region.

The deputy added that the corridor will provide overland communication between Turkic countries, as well as the integration of the Middle Corridor and the East–West and North–South transport routes.

This news edited with AI

Latest News