Hikmet Hajiyev: Work on the section of the Zangezur corridor to the border with Armenia is being completed
 
                            Work on the section of the Zangezur Corridor to the border with Armenia has reached the final stage.
As BAKU.WS reports, Assistant to the President of Azerbaijan - Head of the Foreign Policy Department of the Presidential Administration Hikmet Hajiyev wrote about this on social network X.
"Work on the section of the Zangezur Corridor to Azerbaijan's border with Armenia has reached the final stage. Our country is carrying out intensive work on the ground to establish regional transport and logistics connections," he noted.
Zangazur Corridor comes to final completion towards Azerbaijan-Armenia border. Azerbaijan is doing its hard work on the ground to establish regional transport and logistics connectivity!!! pic.twitter.com/DW6KKqEUMT
— Hikmet Hajiyev (@HikmetHajiyev) October 31, 2025
Similar News
Ali Asadov held a meeting with the chairman of the board of the Istanbul Chamber of Industry
On October 31, the Prime Minister of the Republic of Azerbaijan Ali Asadov met with the chairman of the board of Istanbul Industrial Chamber Erdal Bahchivan. As...
 
                     
                                             About us
                        About us
                     
                             
                     
                     
                    